AN ASSESSMENT OF THE IMPACT OF ABATTOIR EFFLUENT DISCHARGE ON THE WATER QUALITY OF RIVER ILLO, OTA

By

DAVID OLUGBENGA OMOLE, B.Eng , mnse CUGP040092

Presented To

Department of Civil Engineering

ABSTRACT
This report presents results obtained from the investigation and water sampling exercise carried out on the segment of River Illo that passes through Sango in Ado Odo-Ota Local Government Area, Ogun State, Nigeria. The report reveals that while some people used water from the river for domestic, food production and recreation purposes, others discharge their wastes without any form of pre-treatment into it. The multipurpose usage of water from River Illo by local residents thus hinges public health on the self purification capacity of the river alone.   
Information on water use and waste disposal practices of the local residents were obtained through direct observation and oral interview of members of randomly chosen households built along the river within a distance of 2km. Single grab samples of water were obtained from the river at the site of an abattoir effluent discharge at distances 0m, 10m, 20m, 30m, 50m and 100m from the point of discharge. A seventh sample was also obtained 10m upstream of the point of effluent discharge to furnish information on ambient conditions of the river prior to pollution while an eighth sample which was prepared by diluting the water obtained at 0m with distilled water (i.e. 25%  stream water, 75% distilled water) was included to serve as control sample. All water samples were transported (within 3 hours of isolating them from the river body) to the laboratory for analysis and the results were subjected to graphical, statistical and mathematical analysis. Pollution from the abattoir caused a drop in dissolved oxygen level of the river from an ambient value of 4.6mg/l to 0.01mg/l at the point of discharge. The pollution also caused an increase of 447.5mg/l to 1071.5mg/l in T.S., 0.04mg/l to 4.4mg/l in ammonia, 170mg/l to 670mg/l in BOD, 0.05mg/l to 3.05mg/l in phosphorus, 50mg/l to 1066.7mg/l in alkalinity and 18mg/l to 820mg/l in Acidity. It was also found out that between 30m â€" 80m downstream of the pollution point, a threat of eutrophication is caused by plants growing in the river path. Despite this obstruction, the river recovered considerably to a D.O. level of 3.9mg/l at 100m downstream. Results from the dispersion modeling shows the self-purification capacity of the river, f, to be 1.1 within 30m distance from the point of discharge and 0.8 between 30m and 100m from the point of discharge. The results from the application of the Streeter-Phelps model showed that the eutrophication occurring between 30m â€" 80m is interfering adversely
with the self purification processes of the river.   The percentage compliance of each of the eight water samples with Guideline Values (GLV) of WHO and FEPA was performed. None of the samples met the minimum requirements for BOD, COD and TSS, which are indicators of pollution. It was concluded that River Illo is being polluted by abattoir effluents discharge thereby exposing the health of local residents who use the water from the river for domestic, recreation and food production purposes to avoidable risks. Suggested actions that could further complement the self-purification capacity of the river were offered.
TABLE OF CONTENTS             Page
Title Page - - - - - .i
Certification - - - - - ..ii
Acknowledgement - - - - ..iii
Dedication - - - - - iv
Table of Contents - - - - - ..v
List of Tables - - - - - ..xiii
List of Figures - - - - - ix
List of Plates - - - - - x
Abbreviations and Symbols - - - - ..xi
Abstract - - - - - ..xii
 
CHAPTER ONE: INTRODUCTION
1.1 Background information - - - - .. 1
1.2 General Description of River Illo - - - - 2
      1.2.1 Identified Sources of pollution - - - . 2
      1.2.2 Water Uses and Conflict - - - - - .. 3
1.3 Statement of the problem - - - - - .  4
1.4 Justification of the Study - - - - . 5          
1.5 Objectives of the Study - - - - - - .  5
1.6 Expected Contributions to Knowledge - - - - - . 6
1.7 Scope of the Study - - - - .. 6
 
CHAPTER TWO: LITERATURE REVIEW
2.1 Surface Water Quality and Anthropogenic Activities - - 7
2.2 Slaughterhouses - - - - .7
2.2.1 Characterization of slaughterhouse wastes - - ..8
2.2.2 The Nigerian Experience - - - ..8
2.2.3 Abattoir Waste Management - - - ..9
2.2.3.1 Waste Treatment Methods - - - ..10
2.2.3.2 Pollution Prevention - - - 11
2.3 Parameters Frequently Examined in the Determination of Water Quality - .12
2.3.1 Physico-ChemicaParameters - - - ..12
2.3.2 Microbiological Parameters - - - 15
2.4 Water Pollution and Control in Nigeria - - - 16
2.5 Water Laws and Standards - - - - ..18
2.6 Water Quality Measurements and Quantitative Hydrology - - 19
2.6.1 Assimilative Capacity Studies - - - 20
2.7 Field Survey and Sampling - - - - .21
2.8 Quality Control and Assurance - - - .21
2.9 Data Interpretation - - - - ..23
 
CHAPTER THREE: METHODOLOGY
3.1 Field Survey and Sampling Exercise - - - .25
3.2 Sampling Locations - - - - 26
3.3 Conditions of Sampling - - - - 28
3.4 Quality Control and Assurance - - - - .29
3.5 Laboratory Analysis - - - - - 29
3.6 Data Analysis - - - - - .30
3.7 Solid Waste Management - - - - 30
 
CHAPTER FOUR: RESULTS AND DISCUSSIONS

4.1 The Abattoir - - - - - 34
4.2 Solid Waste Characterization and Management practice at the abattoir - 34
4.3 Hydraulic Data - - - - - .36
4.4 Water Quality Parameters - - - - ..36
4.4.1 Physical Parameters - - - ..36
4.

About e-Project Material Centre


e-Project Material Centre is a web service aimed at successfully assisting final year students with quality, well-researched, reliable, and ready-made project work. Our materials are recent, complete (chapter 1 to Minimum of Chapter 5, with references), and well-written. INSTANT ACCESS! INSTANT DOWNLOAD. Simply select your department, choose from our list of topics available, and explore your data.

Why Students Love to Use e-Project Material?


Guaranteed Delivery: Getting your project delivered on time is essential. You cannot afford to turn in your project past the deadline. That is why you must get your project online from a company that guarantees to meet your deadline. e-Project Topics Material Centre is happy to offer instant delivery of projects listed on our website. We can handle just about any deadline you send our way. Satisfaction Guaranteed: We always do whatever is necessary to ensure every customer's satisfaction.

Disclaimer


e-Project Topics Material Centre will only provide projects as a reference for your research. The projects ordered and produced should be used as a guide or framework for your own project. The contents of the projects should help you generate new ideas and thoughts for your own project. It is the aim of e-Project Topics Centre to only provide guidance by which the projects should be pursued. We are neither encouraging any form of plagiarism nor are we advocating the use of the projects produced herein for cheating.

Terms and Conditions


Using our service is LEGAL and IS NOT prohibited by any university/college policies. You are allowed to use the original model papers you will receive in the following ways:
  • As a source for additional understanding of the subject
  • As a source for ideas for your own research (if properly referenced)
  • For PROPER paraphrasing (see your university definition of plagiarism and acceptable paraphrase) Direct citing (if referenced properly)
Thank you so much for your respect to the author's copyright.

Refund and Privacy Policy


  • Refunds: All sales are final. However, if you encounter any issues with accessing your purchased material, kindly contact our support team for immediate resolution.
  • Privacy Policy: Your personal information is protected and will not be shared with third parties. We ensure secure payment processing and data confidentiality.

Contact Information


X

Need Help Finding or Downloading Your Project Material?

If you don't see the topic you're looking for or You need urgent/express attention, click the WhatsApp Icon/link below to contact ADMIN and get the material you need instantly. We are always available online to attend to your needs. Thanks