Site Logo E-PROJECTTOPICS

TIME AND COST PERFORMANCE LIABILITY ALLOCATION IN THE BUILDING PROCESS


📝


Presented To


Engineering Department

📄 Pages: 93       🧠 Words: 8863       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 231      

⬇️ Download (Complete Report) Now!

ABSTRACT
The subject of this thesis is construction risks and the allocation of any loss incurred as a result of their occurrence amongst parties to a contract. This is with the broad aim of improving on the achievement of cost and time t a r g e t s for a project, hence, reducing cases of abandoned projects in Nigeria. To this end, the following objectives were pursued. The identification of those factors that cons t i t u t e risk, examination of the roles of the conditions and types of contract in the allocation of these r i s k s , and the determination of a reasonable proportion of allocation among the parties to a contract. In pursuance of the objectives of this thesis, a pretested questionnaire was administered in conjunction with personal interviews of consultants in the construction i n d u s t r y. The survey covered Lagos, Oyo, Kacluna, Bauchi and Borno States. Seventy-six percent (76%) of respondents argued that poor achievement of cost and time targets in building projects can be attributed to non-compliance with the conditions of contract which is the main vehicle for allocating construction r i s k s . The major reason advanced for this situation is that the conditions of contract as presently constituted does not reflect the Nigerian construction environment. The need to review the conditions of contract to take into proper consideration, those risks oi particular relevance to the Nigerian construction environment was emphasised. This thesis has identified risks that often adversely affect construction projects when they occur. Proportions of allocation amongst the parties to a contract that are anticipated to effectively provide for any loss incurred as a result of the occurrence of these risks were subsequently proposed. The likely benefits when the proportions of allocation are implemented include the minimization of litigations and conflicts among the parties to a contract and the achievement of more competitive and realistic tenders from contractors. The responsibility for a percentage of the loss caused by the occurrence of an externally arising risk factor by each of the parties to a contract, ensures the utilization of their incentive to mitigate losses. Their commitment to the successful completion of the project is thus assured.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 93       🧠 Words: 8863       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 231      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

INFLUENCE OF COMPRESSION RATIO ON THE PERFORMANCE CHARACTERISTICS OF A SPARK IGNITION ENGINE DEVELOPMENT AND PERFORMANCE EVALUATION OF AN AGITATED QUENCHING TANK/BATH HYDRAULIC AND CONTAMINANT TRANSPORT PERFORMANCE OF COMPACTED LATERITIC SOIL– BENTONITE MIXTURES PROPOSED AS WASTE CONTAINMENT BARRIER DESIGN, CONSTRUCTION AND PERFORMANCE EVALUATION OF A FIXED BED PYROLYSIS SYSTEM RELIABILITY-BASED DESIGN RULES FOR THIN-WALLED STRUCTURAL STEEL BEAM-COLUMN ELEMENTS The Effect of Disc Deterioration on the Performance of Ultra Low Volume Sprayer DEVELOPMENT OF PILOT SIZE PROCESS FOR ZEOLITE Y AND ZSM-5 PRODUCTION FROM KANKARA KAOLIN PERFORMANCE CHARACTERISTICS OF THE CRITICAL-DEPTH, LONG-THROATED FLUME PRODUCTION AND PERFORMANCE EVALUATION OF BIODIESEL FROM HIBISCUS SABDARIFFA AND HIBISCUS SURATTENSIS SIMULATION, DEVELOPMENT AND PERFORMANCE EVALUATION OF A SOLAR/GAS HYBRID POWERED ABSORPTION AIR – CONDITIONING SYSTEM DEVELOPMENT AND PERFORMANCE EVALUATION OF HYDRAULIC PISTON PRESS BIOMASS HOLLOW BRIQUETTE MAKING MACHINE PERFORMANCE OF TWO AGRO-HYDROLOGICAL MODELS IN SIMULATING SOIL WATER BALANCE OF A RAINFED MAIZE FIELD DEVELOPMENT OF MULTICAST ALGORITHM FOR THE DETERMINATION OF MINIMUM COST OF BANDWIDTH OVER CODED PACKET WIRELESS NETWORK THE USE OF ENCASEP TIMEBER BEAMS AS ALTERNATIVE TO REINFORCED CONCRETE BEAMS DEVELOPMENT OF A PROCESS ROUTE FOR THE BENEFICIATION OF MALLAM AYUBA MANGANESE DEPOSIT TO FERROMANGANESE FEED GRADE SYNCHRONOUS MACHINE PARAMETER EXTRACTION FROM REAL TIME OPERATING DATA MODELLING AND SIMULATION OF BIODIESEL BLENDS PERFORMANCE IN COMPRESSION IGNITION ENGINES RELIABILITY ANALYSIS OF PRESTRESSED ELECTRIC TRANSMISSION CONCRETE POLES PERFORMANCE EVALUATION OF MINI SPRINKLER IRRIGATION SYSTEM: COMPARISON OF THE PLASTIC AND IRON MADE SPRINKLER SYSTEM MIXING CHARACTERISTICS AND PERFORMANCE OF STABILIZATION PONDS

click on whatsapp