Site Logo E-PROJECTTOPICS

AN ASSESSMENT OF CONTRACTOR’S RISKS EXPOSURE WITHIN SOME STANDARD FORMS OF BUILDING CONTRACT IN NIGERIA


📝


Presented To


Environmental Design Department

📄 Pages: 80       🧠 Words: 9666       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 204      

⬇️ Download (Complete Report) Now!

ABSTRACT
Construction projects are subjected to several risks due to different activities involved. The activities are performed by several parties under different circumstances. Among the various stakeholders the Contractor has been identified to be the party that carries the highest number of risks. They are mostly exposed to contractual risks which occur as a function of contract provisions and clauses. This research work identified and assessed the risks which Contractors are exposed to within some Standard Forms of Contract in Nigeria. It further determined the likelihood of occurrence of the identified risks, impact on the risks on Contractors and the level of risks. Data were collected through questionnaires distributed to some Contractors around Abuja and analysed using qualitative risk analysis technique. The research identified 35 potential risk factors with 54% of the risks emanating from the Clients, 31% from the Architect, 6% from the Quantity Surveyor, 6% from the Project Managers and 3% from the government agents. It also found out that failures to write instructions regarding variations and documents which are not issued on time are the major potential risk factors with high likelihood of occurrence while the other risk factors have moderate likelihood of occurrence. Thirteen (13) potential risk factors were found to have high impact on Contractors and fifteen (15) are high degree of risk. It concluded that Contractors must understand the nature of risks, their source and the extent of exposure so as to pay attention to dealing with such risks in present and future projects. The study therefore recommended that Contractor should pay attention to risks with high likelihood of occurrence so as to reduce their impact, should protect themselves against risks by contingency, warn parties of potential delays and its implications, negotiate construction schedule with client and allow for buffer time, the contractor should ensure working with carefully prepared and coordinated drawings, establish clear line of communications for receiving and responding to instructions and collaborative effort from all the participants of the project.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 80       🧠 Words: 9666       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 204      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

ASSESSMENT OF THE IMPLEMENTATION OF ABUJA TOURISM DEVELOPMENT MASTER PLAN (2000 – 2010) A METAPHORIC TRANSFORMATION OF THE PAWPAW TREE INTO FEMALE FORMS IN PAINTING ASSESSMENT OF NIGERIAN NATIONAL CARNIVAL COSTUME AND ITS REBRANDING FOR GREATER APPRECIATION MODIFICATION OF NIGERIAN TRADITIONAL MEN’S HORIZONTAL LOOM TO ENHANCE PRODUCTIVITY OF THE NARROW BAND FABRIC APPRAISAL OF TOURISM HABITS OF ACADEMIC STAFF IN SELECTED UNIVERSITIES IN NIGERIA SITE COST CONTROL MODEL FOR MEDIUM SIZED BUILDING PROJECT DETERMINATION OF THE PROSPECT OF PARTNERING AS PROCUREMENT METHOD IN THE NIGERIAN CONSTRUCTION INDUSTRY A FUSION OF OLELE DANCE FORMS IN PAINTING EVALUATING THE MOTIVATIONAL FACTORS OF EMPLOYEE-CONSULTANTS IN THE NIGERIAN CONSTRUCTION INDUSTRY ASSESSMENT OF SOME INDICES OF PROFESSIONALISM IN THE NIGERIAN CONSTRUCTION INDUSTRY AN APPRAISAL OF CONVERSION PROCESS OF BUILDINGSIN TERTIARY INSTITUTIONS AN ANALYSIS OF UNCONVENTIONAL MATERIALS USED FOR ART EXPRESSION BY NINE (9) SELECTED NIGERIAN ARTISTS EVALUATING PASSIVE COOLING STRATEGIES FOR ENERGY EFFICIENCY IN THE DESIGN OF SENATE BUILDING FOR FEDERAL UNIVERSITY KASHERE, GOMBE STATE ANALYTICAL AND APPROXIMATE VARIANCE OF PUBLIC BUILDING TOTAL PROJECT COST, ESTIMATION BY MEAN COMPONENT COSTS METHOD GEOSPATIAL ANALYSIS OF QUARRY ACTIVITIES IN MPAPE DISTRICT, ABUJA NIGERIA USE OF BUILDING FORMS AS ACOUSTICAL TREATMENT IN THE DESIGN OF AN IDOMA CULTURAL CENTRE ELECTRICAL ENERGY EFFICIENCY IMPROVEMENT IN COMMERCIAL BUILDINGS ASSESSMENT OF PATRONAGE OF COJA 2003 SPORTING FACILITIES AND IMPLICATIONS FOR SPORTS TOURISM EVOLVING SPACE STANDARD FOR FAMILY CAREGIVERS IN HOSPITALDESIGN: PROPOSED DANDUME GENERAL HOSPITAL PLANNING, DECISION MAKING AND PUBLIC PARTICIPATION IN HOUSING PROGRAMMES IN NIGERIA

click on whatsapp