Site Logo E-PROJECTTOPICS

ASSESSMENT OF THE IMPLEMENTATION OF THE CENTRAL AREA DEVELOPMENT PLAN OF THE FEDERAL CAPITAL CITY, ABUJA


📝


Presented To


Environmental Design Department

📄 Pages: 80       🧠 Words: 10087       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 236      

⬇️ Download (Complete Report) Now!

ABSTRACT
Capital City Central areas planning provides a sound basis for policy making that leverages the social and economic capital of the overall city. The framework for the F.C.C. Abuja's central area development plan provides the base for effective development of the area and measurable policy targets for the F.C.T region that are cognisant of the global dimes and community expectations that will influence its development in the next century. These framework include, the increasing state of International Competitiveness in attracting foreign capital, social change to derive demand for a more and more diverse housing stock; need for innovative infrastructure, including modes of transport and better use of monitoring and information systems to generate efficiency in existing infrastructure and eco-friendly environment. The study reviewed the comprehensive development plan implementation of the Central Area which articulated the above development frameworks, the results of the outcome were found grossly poor and below a pass mark for the assessment which is 50%. Several factors were identified as responsible for the negative outcome of the implementation programme and recommendations were offered so as to enable the improvement of both the plan and implementation programme, these includes good Urban Governance, review of the plan implementation programme, providing adequate source of funding, adopting appropriate planning and design approaches, improve the municipal financial base and improve development control system. These are in view of the need for an improved implementation programme for the central area of the capital city of the country.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 80       🧠 Words: 10087       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 236      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

URBAN RENEWAL PROGRAMME FOR IMPROVING BLIGHTED AREAS ASSESSMENT OF THE TRAINING NEEDS OF CRAFT SKILL WORKERS IN NORTH-WESTERN NIGERIA AN ARCHITECTURAL RESPONSE TO INTEGRATING USER FACILITIES IN THE PROPOSED REDEVELOPMENT OF JOS RAILWAY TERMINUS AN ASSESSMENT OF THE ENTREPRENEURIAL SKILLS OF QUANTITY SURVEYING CONSULTANTS IMPLEMENTATION OF URBAN PHYSICAL PLANNING SCHEMES IN NIGERIA AN ASSESSMENT OF JOS PLATEAU VOLCANIC DEPOSITS AS POZZOLANS AND ITS EFFECT ON BLENDED ORDINARY PORTLAND CEMENT CONCRETE AN ASSESSMENT OF PARTICIPATION IN OUTDOOR RECREATION ACTIVITIES IN YENAGOA TOWN ASSESSMENT OF SOME INDICES OF PROFESSIONALISM IN THE NIGERIAN CONSTRUCTION INDUSTRY ABUJA INTERNATIONAL TRADE FAIR COMPLEX AN APPRAISAL OF PHYSICAL INFRASTRUCTURES IN TRADE FAIR CENTRES IN NIGERIA PHYSICAL PLANNING PROBLEMS AND PROPOSALS DEVELOPMENT OF A POST-OCCUPANCY EVALUATION TOOLKIT FOR STUDENT HOSTEL ANALYSIS OF MODAL SPLIT CHARACTERISTICS FOR EFFICIENT TRANSPORT PLANNING POLICY PLANNING ANALYSIS OF WATER SUPPLY IN KADUNA METROPOLIS M.SC (U.R.P) THESIS DEVELOPMENT OF A PROTOTYPE ELECTRONIC DOCUMENT AND RECORD MANAGEMENT SYSTEM (EDRMS) FOR SMALL AND MEDIUM BUILDING FIRMS REDEVELOPMENT OF SOKOTO AIRPORT TERMINAL BUILDING IMPLEMENTING THE 1992 URBAN AND REGIONAL PLANNING LAW RECONSTRUCTION OF CENTRAL MARKET, JOS; Exploring Architectural Determinants to Urban Renewal Assessment of the Role of Federal Government in Physical Development of Metropolitan Kano PLANNING FOR MEDIUM SIZE CITIES IN KANO STATE: A REVIEW OF THE EXISTING KANO MASTER PLAN TRANSIT REST AREA

click on whatsapp