Site Logo E-PROJECTTOPICS

RELIABILITY ASSESSMENT OF GSM POWER SYSTEM NETWORK

(A CASE STUDY OF AIRTEL NIGERIA LIMITED)


πŸ“


Presented To


Engineering Department

πŸ“„ Pages: 96       🧠 Words: 9588       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 358      

⬇️ Download (Complete Report) Now!

ABSTRACT
This work presents the reliability assessment of the Power sub-system of the North West Region of Airtel network for a period of one year. The Power model was found to be an integrated setup of major Power subcomponents such as transformer, automatic voltage regulator, generators, rectifier system, battery bank, and Power control systems such as automatic transfer switch and automatic main failure, which are all interfaced in a definite topological structure, with unique redundancy model at each network site.The impact of critical power failure event at different hierarchical stations on the subscribers was also assessed. The reliability data for power sub-system was collected to determine the reliability indices of the power equipment. The data were analysed using the MATLAB version 7.4 software. The two-generator system at the integrated switch sites, integrated hub sites, terminal end sites and independent of PHCN powe supply on the network exhibited relatively high reliability with fault tolerance by the prevalence of duty cycle availability indices of 51.83%, 56.00% and 56.5% respectively under a standard configuration of 50.00% duty cycle absolute availability index for a generator unit. The rectifier system with modules of failure rate of 0.040/103h installed on the network was deduced to possess a high reliability index close to unity within a unit hour interval. Empirical findings show that the use of battery units with voltage rating of 3V, 6V and 12V on the network of -48V combinatorial battery bank system would yield relatively high reliability close to unity. The study result showed that the efficiency of the network power system model depends on the degree of automation of the subcomponents and the degree of ambient condition changes. It was concluded that the reliability standards of the GSM power sub-system are dynamic and depends on the redundancy mode of each subcomponents, the degree of redundancy, the failure ratings or lifecycle and scalability of the subcomponents unit used in the system under optimal working conditions of all the subsystems and ideal maintenance practice.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

πŸ“„ Pages: 96       🧠 Words: 9588       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 358      

⬇️ Download (Complete Report) Now!

πŸ”— Related Topics

PREDICTION OF LINK RELIABILITY IN A WIRELESS MOBILE AD HOC NETWORK (MANET) DUE TO PATH LOSS EFFECTS USING WEIBULL DISTRIBUTION STATE-SPACE DESIGN AND CONSTRUCTION OF A MAGNETIC SUSPENSION SYSTEM DEVELOPMENT OF AN IMPROVED INTEGRATED ROUTING PROTOCOL FOR OPPORTUNISTIC NETWORK WITH CONGESTION CONTROL USING PRE-EMPTIVE DATA EVICTION FLOOD RISK ASSESSMENT OF OFU RIVER CATCHMENT IN NIGERIA ASSESSMENT OF THE IMPACT IMPACT OF CLIMATE CHANGE ON WATER RESOURCES AVAILABILITY IN THE SOKOTO-RIMA RIVER BASIN DEVELOPMENT OF A MODIFIED EAST-WEST INTERFACE FOR DISTRIBUTED CONTROL PLANE IN SOFTWARE DEFINED NETWORK FOR WIDE AREA NETWORKS PERFORMANCE EVALUATION OF MINI SPRINKLER IRRIGATION SYSTEM: COMPARISON OF THE PLASTIC AND IRON MADE SPRINKLER SYSTEM RELIABILITY-BASED ANALYSIS OF COMPOSITE SOLID SLENDER TIMBER COLUMNS WITH ALUMINIUM LAMINATES USING SELECTED NIGERIAN TIMBER SPECIES APPLICATION OF GLOBAL POSITIONING SYSTEM (GPS) AND GEOGRAPHIC INFORMATION SYSTEMS (GIS) IN MANAGEMENT OF TRAFFIC RELIABILITY-BASED ANALYSIS AND CALIBRATION OF EUROCODE 5 DESIGN CRITERIA FOR A SOLID TIMBER PORTAL FRAME MODELLING AND OPTIMIZATION OF PID CONTROLLER’s PARAMETERS FOR DEEP SPACE ANTENNA POSITIONING SYSTEM USING GENETIC ALGORITHM APPLICATION OF BAT ALGORITHM-BASED METHOD FOR MULTI-OBJECTIVE OPTIMAL NETWORK RECONFIGURATION AND DISTRIBUTED GENERATION PLACEMENT IN RADIAL DISTRIBUTION NETWORK BACTERIAL FORAGING ALGORITHM BASED TUNING OF ON-LOAD TAP CHANGING TRANSFORMER FOR VOLTAGE REGULATION IN POWER TRANSMISSION NETWORK EXPERIMENTAL AND PROBABILISTIC ASSESSMENT OF CONCRETE INCORPORATING EXPANDED POLYSTYRENE (EPS) WASTE AT ELEVATED TEMPERATURES A COMBINED BIOGAS PLANT AND INCINERATOR SYSTEM FOR MUNICIPAL SOLID WASTE MANAGEMENT ASSESSMENT OF THE HYDROPOWER POTENTIAL OF GORONYO DAM IN SOKOTO STATE, NIGERIA SIMULATION OF ERROR CORRECTION CODES ON WIRELESS COMMUNICATION SYSTEMS DEVELOPMENT OF A DYNAMIC OUTPUT-FEEDBACK REGULATOR FOR STABILIZATION AND TRACKING OF NON-SQUARE MULTI-INPUT MULTI-OUTPUT SYSTEMS AN ASSESSMENT OF THE QUALITY OF SANDCRETE HOLLOW BLOCKS WITH PARTICULAR REFERENCE TO BAUCHI AND GOMBE STATES DEVELOPMENT OF A SHUNT ACTIVE POWER FILTER FOR HARMONIC REDUCTION USING SYNCHRONOUS REFERENCE FRAME WITH SPACE VECTOR PULSE WIDTH MODULATION

click on whatsapp