Site Logo E-PROJECTTOPICS

ANALYTICAL AND APPROXIMATE VARIANCE OF PUBLIC BUILDING TOTAL PROJECT COST, ESTIMATION BY MEAN COMPONENT COSTS METHOD


📝


Presented To


Environmental Design Department

📄 Pages: 88       🧠 Words: 8473       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 284      

⬇️ Download (Complete Report) Now!

ABSTRACT
Building construction project has become an everyday issue, and this involves the spending of hard earned money by the project owner called the client. The expectation of the owner of any building project is justification of good project delivery. This is enabled by the objectives of the project which definitely includes project cost that envelopes the cost and quality of delivery at the expected time. The major issue, is the project cost which dictates its success. Project cost variance has been affecting the speedy and successful delivery of building construction projects. The key fact in this study method was to collect and analyse public building project cost estimates containing building components, which includes preliminaries, substructure, superstructure, mechanical/electrical, external works and contingency in the bill of quantity (BOQ) from projects handled by Education Trust Fund(ETF) in the tertiary institutions located in Kaduna, Kwara, Kogi and Abuja from 2009 to 2010. The study adopted mean component cost method modeled by Skitmore and Ng (2002) to determine the projected cost variance of the Lecture Theatres and Lecture Rooms handled by the organization in various tertiary institutions in Nigeria. The analysis of the data collected was made by using standard method of analysis which employs SPSS for the project costs.Skitmore and Ng (2002) model was employed to test the variability of the project cost data. The result shows that; the building component cost data 4782.50 had closer link to the mean 4773.92(mean) for preliminaries component column in project ID 4 of Lecture Theatreandanother component data 2797.62 is also close to 2312.91(mean) for Ext.Wkscolumn in project ID 7 for the Lecture Theatre building projects butfor the Lecture Classrooms building the preliminaries column had 1531.41 and 1416.33(mean) in project ID 2 and 1611.22 and 1673..58(mean) for M/E column for project ID 5. This project therefore concludes in addition to the results of the cost variances, that the lecture theatre and classrooms projects are underestimated.Interview was also conducted on the professional estimators in building industry. Moreover significant differences exist among the components in those public buildings.The analytical calculation shows that the correct variance for an average lecture theatre project from this research was found to be 34.73%. The sample analyzed had shown that the correct variance of the class room was found to be 38. 50%. Therefore lecture theatre is observed to be a better building project than the class room building. The study recommends the need to minimize the occurrence of the overrun by thoroughly crosschecking the initial estimate and addressing other technical issues before the contract is awarded. It also recommends the employment of the mean component cost method of analysis and setting of a committee to properly scrutinize the estimate.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 88       🧠 Words: 8473       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 284      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

RELIABILITY OF THE ENGINEERS ESTIMATE IN SELECTIVE TENDERING FOR BUILDING WORKS AN EVALUATION OF SOME SUSTAINABLE RURAL DEVELOPMENT COMPONENTS IN THE DESIGN OF THE HADEJA-NGURU WETLANDS CONSERVATION PROGRAMME APPRAISAL OF SANITARY FACILITIES IN PUBLIC AREAS OF GARKI DISTRICT AN APPRAISAL OF THE PERFORMANCE OF STAKEHOLDERS MANAGEMENT IN CONSTRUCTION PROJECTS LANDSCAPE AS A MEANS OF ENHANCING TOURIST RESORT THE EFFECTS OF ASSIGNMENT METHOD OF TEACHING ON STUDENTS’ PERFORMANCE IN ART IN SECONDARY SCHOOLS MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA DEVELOPMENT OF PUBLIC PROCUREMENT STRATEGY FOR THE PROVISION OF POTABLE WATER INFRASTRUCTURE TO LOW INCOME URBAN AREAS (LIUAs) CREDIT FACILITIES IN THE FINANCIAL INSTITUTIONS FOR FINANCING CONSTRUCTION PROJECTS IN NIGERIA Assessment of the Impact of Contraventions of Building Regulations on the Architecture of Mixed Landuse Areas of Kano Metropolis AN ASSESSMENT OF THE IMPLEMENTATION OF UNIVERSAL DESIGN PRINCIPLES IN THE PROVISION OF BUILDING SERVICES IN MULTI-STOREY BUILDINGS AN ASSESSMENT OF CONTRACTOR’S RISKS EXPOSURE WITHIN SOME STANDARD FORMS OF BUILDING CONTRACT IN NIGERIA DEVELOPING A PROACTIVE COST MANAGEMENT MODEL FOR BUILDING PROJECTS IN NIGERIA ARCHITECTURAL RESPONSE TO EFFECTS OF WIND ON HIGH RISE BUILDING FORMS IN THE DESIGN OF MIXED-USE AT EKO ATLANTIC CITY LAGOS RISK IDENTIFICATION AND ASSESSMENT IN HOUSING DEVELOPMENT PROJECTS USING ANALYTICAL HIERARCHICAL PROCESS DEMAND ESTIMATION FOR OUTDOOR RECREATIONAL ACTIVITIES IN KADUNA METROPOLIS A POST OCCUPANCY EVALUATION OFPATIENTS' SATISFACTION WITH NIGER STATE GOVERNMENT HOSPITAL BUILDINGS THE USE OF ARCHITECTURAL COMPONENTS IN MINIMISING MAINTENANCE FOR KADUNA STATE UNIVERSITY STUDENT CENTRE, KAFANCHAN AN APPRAISAL OF THE CRITICAL SUCCESS FACTORS OF PROJECT PARTNERING TOWARDS ITS ADOPTION IN THE NIGERIAN CONSTRUCTION INDUSTRY THE EFFECTS OF THE SOCRATIC METHOD ON STUDENTS ART PERFORMANCES IN SECONDARY SCHOOLS

click on whatsapp