Site Logo E-PROJECTTOPICS

MODELLING OF COST OVERRUNS IN BUILDING PROJECTS IN ABUJA


📝


Presented To


Environmental Design Department

📄 Pages: 86       🧠 Words: 11537       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 472      

⬇️ Download (Complete Report) Now!

ABSTRACT
Construction of building projects is an endeavour that involves capital expenditure, which is either borrowed or self-financed by clients. The expected outcome of such expenditure is value for money, which is usually dictated by project objectives of cost, time and quality. Project cost, as a project objective, is a crucial determinant of project success in the prevailing economic challenges being experienced globally. Construction cost overrun has become a reoccurring phenomenon in the delivery of building projects. The major thrust of this study was to identify, analyse and model the factors that contribute to building construction cost overruns in Abuja. The study adopted a Monte-Carlo technique in simulating cost overrun using DiscoverSim version 1.1 (SigmaXL, 2013) simulation and RiskAmp Microsoft Excel add-in software to analyse data obtained from literature review, review of project documents with contract sum of over Five Million Naira executed within Abuja city in addition to interview sessions with construction professionals. The study revealed that significant cost overruns are mainly due to re-measurement and variation. The simulation result elucidated that less than 10% of building projects are completed below the initial contract sum in Abuja which could be due to the fact that projects tend to be initiated and executed without adequate project information such as client brief, design details and specifications. The study recommends the need for minimizing occurrence of re-measurement in building projects through provision of full design information prior to contract award, development of simulation model for specific project categories and establishment of a project cost overrun band that will enable a scientific measurement of project's value for money benchmarked against initial cost estimate.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 86       🧠 Words: 11537       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 472      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

APPRAISAL OF STAKEHOLDER MANAGEMENT PRACTICE IN TERTIARY EDUCATION TRUST FUND (TETFUND) CONSTRUCTION PROJECTS AN ASSESSMENT OF THE VARIABILITY OF COST AND TIME RELATED ITEMS OF PRELIMINARIES IN BUILDING CONTRACTS IN NIGERIA AN EXPRESSION OF IMAGERY IN COURT BUILDINGS AN APPRAISAL OF CONVERSION PROCESS OF BUILDINGSIN TERTIARY INSTITUTIONS AL-MUNTADA AL-ISLAMI NATIONAL HEADQUARTERS ABUJA - NIGERIA: THE EVOLUTION OF ISLAMIC ARCHITECTURE IN NIGERIA AN EVALUATION OF DISASTER PREPAREDNESS IN INDUSTRIAL BUILDINGS OPTIMISING DESIGN STRATEGIES TO MINIMISE MAINTENANCE COST IN PROPOSED POST GRADUATE SCHOOL UMAR MUSA YARADUA UNIVERSITY KATSINA. KNOWLEDGE MANAGEMENT PRACTICE OF BUILDING CONSTRUCTION FIRMS AT PROJECT LEVEL BUILDING FAILURES ASSESSMENT OF THE IMPLEMENTATION OF THE CENTRAL AREA DEVELOPMENT PLAN OF THE FEDERAL CAPITAL CITY, ABUJA EVALUATING LESSONS LEARNED PRACTICES (LLPs) IN PUBLIC PRIVATE PARTNERSHIP (PPP) PROJECTS IN NIGERIA MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA CENTRE FOR PROFESSIONAL EXCELLENCE FOR THE NIGERIAN BUILDING INDUSTRY: DESIGN CONSIDERATIONS FOR PROFESSIONAL HARMONY AN ASSESSMENT OF CONTRACTOR’S RISKS EXPOSURE WITHIN SOME STANDARD FORMS OF BUILDING CONTRACT IN NIGERIA USE OF BUILDING FORMS AS ACOUSTICAL TREATMENT IN THE DESIGN OF AN IDOMA CULTURAL CENTRE EXPLORING BUILDING ENVELOPE DESIGN FOR WARM HUMID ZONES TO OPTIMIZE INDOOR THERMAL COMFORT IN THE DESIGN OF A PROPOSED LEKKI FREE TRADE ZONE RESORT, LAGOS STUDENTS' UNION COMPLEX UNIVERSITY OF ABUJA (SPACE ORGANISATION AS A STIMULUS FOR INTERACTION) COST IMPLICATIONS OF VARIATIONS IN CONSTRUCTION PROJECTS IN NIGERIA USER SATISFACTION STUDY OF SELECTED PUBLIC–PRIVATE PARTNERSHIP PROJECTS PLANNING FOR THE URBAN INFORMAL SECTOR IN ABUJA CITY

click on whatsapp