Site Logo E-PROJECTTOPICS

COST IMPLICATIONS OF VARIATIONS IN CONSTRUCTION PROJECTS IN NIGERIA


πŸ“


Presented To


Environmental Design Department

πŸ“„ Pages: 97       🧠 Words: 6431       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 421      

⬇️ Download (Complete Report) Now!

ABSTRACT
The study carefully examined the cost implications of variation on total contract cost of building projects. It also investigated the extent to which the variations affect the initial contract sums of such building projects. The study which is mainly based on project files and interaction with professionals and clients draws samples of twenty-three (23) completed projects from four states (Kaduna, Kano, Anambra and Imo) within the area of interest. The initial contract sums were obtained from the bills of quantities while the final contract sums were obtained from the final accounts. The sums were subsequently broken down into group building elements. This work shows that the overall increase over initial contract sums is 22.7%. The various final account statements attributed these increases to substructure 3.0%, superstructure 5.7%, finishes and Services has each 3.7%, lulling and furnishings 0.96%, External works 2.1% and preliminaries 1.3%. The gravity of the problem is different for the two types of clients studied, that is, public client 39.1%. and private client 7.2%. The study concludes that variation in most cases result in cosl and lime overruns. Also, since substructure, superstructure, finishes and services have the highest cost magnitude in relation to the total contract sum, they could be seen to be the most critical elements requiring the greatest attention during construction. Suggestion for reducing variation in construction projects includes, adequate planning, comprehensive pre-contract planning , adequate design briefs, guided by proper feasibility and viability studies should be embarked upon before commencing any project. Also Architects should ensure that Quantity surveyors are allowed to estimate the variations before issuing variation orders

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

πŸ“„ Pages: 97       🧠 Words: 6431       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 421      

⬇️ Download (Complete Report) Now!

πŸ”— Related Topics

REDEVELOPMENT PROPOSAL FOR THE NATIONAL MUSEUM KADUNA THE APPLICATION OF INDIGENOUS NIGERIAN ARCHITECTURAL ELEMENTS IN CONTEMPORARY MUSEUM ARCHITECTURE A SURVEY OF CONCRETE PRACTICE ON SELECTED CONSTRUCTION SITES IN NIGERIA A STUDY OF SELECTED ARTISTS FROM FINE ARTS DEPARTMENT AHMADU BELLO UNIVERSITY ZARIA AND THEIR CONTRIBUTIONS TO THE DEVELOPMENT OF CONTEMPORARY ART IN NIGERIA (1981-2002) AN EXAMMINATION OF FACTORS AFFECTING STUDENTS' BEHAVIOUR IN CULTURAL AND CREATIVE ARTS IN JUNIOR SECONDARY SCHOOLSIN NASARAWA STATE, NIGERIA AN EXPLORATION OF SHURUWA MUSICAL INSTRUMENT AND DANCE COSTUME IN PAINTING TOTAL ELECTRON CONTENT ESTIMATION AND ANALYSIS OVER THE NIGERIAN GLOBAL NAVIGATION SATELLITE SYSTEM PERMANENT REFERENCE NETWORK A SURVEY OF THE AVAILABILITY AND USE OF INSTRUCTIONAL MATERIALS FOR ART TEACHING IN FOUR COLLEGES OF EDUCATION IN KADUNA AND PLATEAU STATES, NIGERIA ASSESSMENT OF NIGERIAN NATIONAL CARNIVAL COSTUME AND ITS REBRANDING FOR GREATER APPRECIATION GEOSPATIAL ANALYSIS OF QUARRY ACTIVITIES IN MPAPE DISTRICT, ABUJA NIGERIA URBAN MANAGEMENT IMPLICATIONS OF PERI URBAN GROWTH ADOPTABILITY OF INTEGRATED PROJECT DELIVERY (IPD) CONCEPTS IN THE NIGERIAN CONSTRUCTION INDUSTRY MAPPING AND ANALYSIS OF SITES FOR GRAZING RESERVES IN SOME STATES OF NORTHERN NIGERIA CENTRE FOR PROFESSIONAL EXCELLENCE FOR THE NIGERIAN BUILDING INDUSTRY: DESIGN CONSIDERATIONS FOR PROFESSIONAL HARMONY DEVELOPMENT OF WOOD FIRING KILN IN TERTIARY INSTITUTIONS IN NIGERIA ASSESSMENT OF MOTIVATION OF NON-CONSTRUCTION PROFESSIONALS IN CONSTRUCTION COMPANIES An Investigation into the conditions of contract with regards to claims in some selected building projects DEVELOPMENT OF A WHOLE-LIFE COST IMPLEMENTATION FRAMEWORK FOR THE NIGERIAN CONSTRUCTION INDUSTRY USE OF DAYLIGHTING STRATEGIES FOR LIGHTING ENERGY COST REDUCTION IN A METROPOLITAN LIBRARY DESIGN MODELING DURATION OF BUILDING RENOVATION PROJECTS AN ASSESSMENT OF THE NIGERIAN CONSTRUCTION INDUSTRY’S READINESS TO ADOPT VALUE MANAGEMENT PROCESS IN EFFECTIVE PROJECT DELIVERY

click on whatsapp