Site Logo E-PROJECTTOPICS

DEVELOPMENT OF A WHOLE-LIFE COST IMPLEMENTATION FRAMEWORK FOR THE NIGERIAN CONSTRUCTION INDUSTRY


πŸ“


Presented To


Environmental Design Department

πŸ“„ Pages: 84       🧠 Words: 8474       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 497      

⬇️ Download (Complete Report) Now!

ABSTRACT
Whole Life Cost (WLC) decision-making technique offers immense benefit to building investors as it captures not just the initial cost but also the maintenance, running and terminal costs of proposed buildings. Its application however is constrained by the absence of a standard implementation framework. This research effort was geared towards the development of an implementation framework that addresses; the legal requirement for WLC within the Nigerian construction industry; the limitations of existing frameworks; and major implementation challenges. First the legal requirement for WLC was articulated; the strength and weaknesses of existing frameworks was then assed based on some identified criteria; solutions to some of the critical implementation challenges were then identified through a mixture of theoretical survey, and structured interviews. The entire solution frame was then organised, integrated and harmonised into a framework structure. The framework was then improved by transforming it into programme flowcharts and interfaces to facilitate computer implementation. Result shows that substantial legislations, regulations and guidelines that facilitate the use of WLC are well established. Besides, none of the existing frameworks fully satisfy problem-solving, project life-cycle, and feedback requirement. A profiling of WLC Implementation challenges indicates that client?s lack of demand/ understanding, data scarcity, process complexity, and high level of risk and uncertainty are the most severe. In an attempt to mitigate these limitations, a conceptual framework was proposed. The framework utilises a relational database, a model selection framework and two mathematical models: Modified traditional model which enables the identification of the best alternative based on payback period, net present/net future values, and break-even point and; an Options appraisal model which facilitates the evaluation of embedded WLC opportunities. The present value options appraisal model enables the xxi determination of the optimum investment time thereby improving the decision horizon from two-way to five-way. It also provides estimate of benefit to cost ratios, profitability index on both the net present values and option value. Test result indicates that the database is effective in terms of: storage and retrieval of multiple data types, preservation of data integrity, and ensuring user-friendliness. Furthermore, the test result confirms the efficacy and robustness of: the transformation and integration algorithms in converting one data type to another, and the modified WLC and the options appraisal models. It was recommended that building professionals and consultants be aware of the existence of legal provisions for WLC and also get prepared to take on the challenge placed upon them. They must understand that traditional procurement on the basis of initial cost alone is no more tenable and redirect their attention to the use of WLC as it gives the public better value for money and as such becomes imperative at especially the present times in which the country is experiencing recession. It is anticipated that the framework would improve the usability of WLC in the industry by providing both private and public sector with a robust analysis tool that would facilitate long term property investment decision making.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

πŸ“„ Pages: 84       🧠 Words: 8474       πŸ“š Chapters: 5 πŸ—‚οΈοΈ For: PROJECT

πŸ‘οΈβ€πŸ—¨οΈοΈοΈ Views: 497      

⬇️ Download (Complete Report) Now!

πŸ”— Related Topics

SULTAN BELLO PEACE AND EDUCATIONAL RESOURCE DEVELOPMENT CENTRE, SOKOTO (A Blend of Styles and Symbols) BUILD-OPERATE TRANSFER (BOT) FACTORING METHOD:A FINANCING SCHEME FOR CONSTRUCTION PROJECT ASSESSING THE EFFECTIVENESS OF PUBLIC PRIVATE PARTNERSHIP (PPP) PROCUREMENT MODEL FOR INFRASTRUCTURE DEVELOPMENT IN NIGERIA AN APPRAISAL OF FACTORS MILITATING AGAINST THE EFFECTIVE IMPLEMENTATION OF FORMAL RISK MANAGEMENT TECHNIQUES IN PROJECT DELIVERY COMPARISON OF PERFORMANCE OF TRADITIONAL AND DIRECT LABOUR PROCUREMENT METHODS ADOPTED BY THE NIGERIAN ARMY EVALUATION OF THE INSTITUTIONAL FRAMEWORK OF URBAN TRANSPORT ASSESSMENT OF NIGERIAN NATIONAL CARNIVAL COSTUME AND ITS REBRANDING FOR GREATER APPRECIATION DEVELOPING A PROACTIVE COST MANAGEMENT MODEL FOR BUILDING PROJECTS IN NIGERIA CONTEXTUALISATION OF POTHOLES ON NIGERIAN ROADS IN PAINTING DEVELOPMENT OF SCULPTURE FORFUNCTIONALITY: AN EXPLORATION WITH TERRACOTTA IN THE LANDSCAPE CENTRE FOR PROFESSIONAL EXCELLENCE FOR THE NIGERIAN BUILDING INDUSTRY: DESIGN CONSIDERATIONS FOR PROFESSIONAL HARMONY ASSESSING THE CAPABILITIES OF CONTRACTORS IN MONITORING AND CONTROLLING CONSTRUCTION CASH FLOW IN NIGERIA LEATHER PROCESSING INDUSTRY (TANNERY) ZARIA FINANCING URBAN INFRASTRUCTURE DEVELOPMENT PROJECTS : AN ANALYSIS OF THE STRATEGIES USED IN KADUNA AN APPRAISAL OF THE IMPLEMENTATION OF GREATER YOLA MASTER PLAN 1976 - 1986 AN APPRAISAL OF THE DEVELOPMENT AND MANAGEMENT OF ORGANISED OPEN SPACES IN KADUNA METROPOLIS ASSESSMENT OF THE IMPLEMENTATION OF BWARI MASTER GROWTH AND DEVELOPMENT STUDIES OF SUNFLOWER (Helianthus annuus L.) AS INFLUENCED BY PLANT DENSITY AND SOWING DATE AN ASSESSMENT OF EXPATRIATE CONTRACTORS’ SITE MANAGEMENT PRACTICES IN THE NIGERIAN CONSTRUCTION INDUSTRY EVALUATING MATERIAL APPLICATION WASTE ON BUILDING CONSTRUCTION SITES

click on whatsapp