Site Logo E-PROJECTTOPICS

BUILD-OPERATE TRANSFER (BOT) FACTORING METHOD:A FINANCING SCHEME FOR CONSTRUCTION PROJECT


📝


Presented To


Environmental Design Department

📄 Pages: 100       🧠 Words: 12300       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 479      

⬇️ Download (Complete Report) Now!

ABSTRACT
Public Sector Construction projects In Nigeria are usually beset with the problem of finance; quantum reduction and erratic releases of cash are common. It is usual to find that the projects fall into the category of start and stop or non-commencement, despite budgetary allocations. The use of alternative means of financing some of these projects is an imperative. And the aim of this study is to present one of such alternative, I.e. the BOT-Factoring method. BOT have been a well tried method of construction project financing by Governments. A scheme where Private Sector resources are used in executing Public Projects. An appraisal of a project for a BOT scheme, involves the following: (i) estimating the project's cost, (ii) income estimation and the determination of the project's economic viability, (iii) determination of the concession period, and (iv) establishment of a safeguard. These constitutes the framework of the study. BOT schemes affords a Project Owner the opportunity to embark on a project whose financial requirements are beyond the project owner's capacity. The funds for a BOT project are usually long-term loans sourced from the Private Sector. - vliThis study has identified inadequancy of long-term loans in the Nigeria's financial, market as a constraint for an effective BOT scheme. Thus, harmonising the benefits of BOT and Factoring is believed will address this constraint. The benefits of Factoring; viz, cash advancement and debt collection have been applied in developing the BOT-Factoring concept. Simple economic analysis was carried out, to determine the suitability of the concept. The analysis is against the backdrop of the basic requirement of free market economy where project selection largely depends on numerical indicator's of the project costs and returns based on market prices i.e the prices at which goods and services are traded. The application of the concept was upon the basic premise of the cash situation of a project. It is here concluded that benefits of BOT-Factoring include the use of cash resources other than the Project Owner's own funds and the accommodation of erratic time of cash release that will cause time-overun during project execution.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 100       🧠 Words: 12300       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 479      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

AN ASSESSMENT OF EXPATRIATE CONTRACTORS’ SITE MANAGEMENT PRACTICES IN THE NIGERIAN CONSTRUCTION INDUSTRY WORLD BANK INFRASTRUCTURE DEVELOPMENT FUND (IDF) PROGRAMME: AN ANALYSIS OF THE SUSTAINABILITY OF YOLA-JIMETA PROJECT DEVELOPING FACTOR-BASED MODELS FOR MEASURING AND PREDICTING HAZARD RECOGNITION CAPABILITY OF CONSTRUCTIONWORKERS ASSESSMENT OF BARRIERS TO COMMUNICATION IN THE NIGERIAN CONSTRUCTION INDUSTRY DEVELOPING MODELS FOR PREDICTING THE IMPACT OF RISK FACTORS ON CONSTRUCTION CONTRACTORS’ CASH FLOW FORECASTS IN NIGERIA RECONSTRUCTION OF CENTRAL MARKET, JOS; Exploring Architectural Determinants to Urban Renewal ASSESSMENT OF BUILDERS’ RISK INSURANCE IMPLEMENTATION IN THE NIGERIAN CONSTRUCTION INDUSTRY ASSESSMENT OF COMMUNITY PARTICIPATION IN THE KARU URBAN UPGRADING PROJECT ASSESSMENT OF ORGANISATIONAL LEADERSHIP FOR KNOWLEDGE MANAGEMENT PRACTICE IN THE NIGERIAN CONSTRUCTION INDUSTRY PLANNING AND CONTROL MODEL FOR THE CONSTRUCTION OF A LARGE IRRIGATION PROJECT EVALUATION OF PROJECT RISK AND THE DETERMINATION OF CONTINGENCY SUM FOR BUILDING DEVELOPMENTS IN NIGERIA AN APPRAISAL OF FACTORS MILITATING AGAINST THE EFFECTIVE IMPLEMENTATION OF FORMAL RISK MANAGEMENT TECHNIQUES IN PROJECT DELIVERY ASSESSMENT OF PROFESSIONAL'S PERCEPTION ON MATERIALS MANAGEMENT PRACTICES ON CONSTRUCTION SITES IN SELECTED STATES IN NIGERIA AN ASSESSMENT OF SITE LAYOUT PRACTICES OF SOME CONSTRUCTION FIRMS A SYSTEM APPROACH TO EFFECTIVE PROJECT MANAGEMENT CONTROL ESTIMATES AS A TOOL FOR BUILDING PROJECT COST CONTROL AN APPRAISAL OF PERFORMANCE MEASUREMENT PRACTICE OF CONSTRUCTION FIRMS ENERGY MANAGEMENT SCHEME FOR A UNIVERSITY CAMPUS AN EMPIRICAL DETERMINATION OF LABOUR OUTPUT FOR PAINTING IN THE NIGERIAN CONSTRUCTION INDUSTRY ANALYTICAL AND APPROXIMATE VARIANCE OF PUBLIC BUILDING TOTAL PROJECT COST, ESTIMATION BY MEAN COMPONENT COSTS METHOD

click on whatsapp