Site Logo E-PROJECTTOPICS

MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA


📝


Presented To


Environmental Design Department

📄 Pages: 84       🧠 Words: 12412       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 257      

⬇️ Download (Complete Report) Now!

ABSTRACT
Following widespread acceptance by researchers that the effects of qualitative/managerial construction time-influencing factors need to be considered in project scope-based construction time predicting models, several multivariate models combining project scope and qualitative/managerial factors have been developed. However, it has been shown in literature that the applicability of these models is clearly limited to the regions/countries where they were developed. This study was therefore aimed at developing a multivariate construction time predicting model that will be applicable to the Nigeria construction industry. A self-administered questionnaire survey was used to source information on the quantitative (project scope) factors considered in the study as well as to assess the extent of influence of the qualitative factors on construction time. Principal component regression was used for the data analysis and model development, using SPSS 16.0 for windows. Following a non-normal distribution of errors and a low R2 value obtained when multiple linear regression analysis was first conducted, the study's data set was double log transformed and then partitioned/reclassified to account for public and private sector projects. Three models were developed following the multiple linear regression analysis repeated after transforming and partitioning/reclassifying the study's data set. Two of these models (the public sector model and the private sector model) had high R2 values and were found after testing and validation, to be suitable for predicting construction time, while one of the models (the all projects model) had a low R2 value and was consequently found to be unsuitable for predicting construction time. The models with high R2 values serve as a useful tool to project managers and contractors for predicting construction time, thereby facilitating effective planning.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 84       🧠 Words: 12412       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 257      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

THE FORMULATION OF GLAZES USING RAW MATERIALS FROM SELECTED STATES IN NORTH EASTERN NIGERIA ANALYSIS OF THE RELATIONSHIP BETWEEN ORGANISATIONAL CULTURE AND INNOVATION IN NIGERIAN QUANTITY SURVEYING FIRMS ASSESSMENT OF NIGERIAN NATIONAL CARNIVAL COSTUME AND ITS REBRANDING FOR GREATER APPRECIATION REDEVELOPMENT OF SOKOTO AIRPORT TERMINAL BUILDING ASSESSMENT OF THE TRAINING NEEDS OF CRAFT SKILL WORKERS IN NORTH-WESTERN NIGERIA THE SIGNIFICANCE, MEANINGS AND AESTHETIC VALUES OF SOME NIGERIAN ARMY BADGES THERMAL ZONING PRINCIPLE FOR ENERGY EFFICIENCY IN THE DESIGN OF INDOOR FITNESS AND SPORT CENTRE, WARRI NIGERIA GEOSPATIAL ANALYSIS OF QUARRY ACTIVITIES IN MPAPE DISTRICT, ABUJA NIGERIA THE ADOPTION OF AN APPROPRIATE OIL BURNING SYSTEM FOR SMALL SCALE CERAMIC FIRING IN NIGERIA AN EVALUATION OF THE ENVIRONMENTAL FACTORS THAT LEAD TO ABANDONMENT OF PUBLIC BUILDING PROJECTS AN EXPRESSION OF IMAGERY IN COURT BUILDINGS DEVELOPING MODELS FOR PREDICTING THE IMPACT OF RISK FACTORS ON CONSTRUCTION CONTRACTORS’ CASH FLOW FORECASTS IN NIGERIA BUILD-OPERATE TRANSFER (BOT) FACTORING METHOD:A FINANCING SCHEME FOR CONSTRUCTION PROJECT AN ASSESSMENT OF CONTRACTOR’S RISKS EXPOSURE WITHIN SOME STANDARD FORMS OF BUILDING CONTRACT IN NIGERIA ADOPTABILITY OF INTEGRATED PROJECT DELIVERY (IPD) CONCEPTS IN THE NIGERIAN CONSTRUCTION INDUSTRY AN APPRAISAL OF THE PERFORMANCE OF STAKEHOLDERS MANAGEMENT IN CONSTRUCTION PROJECTS EVALUATING THE INFLUENCE OF ARCHITECTURAL CHARACTER ON INMATES IN THE DESIGN OF PRISONS IN NIGERIA AN EVALUATION OF CONTRIBUTION OF COST CONTINGENCY TOWARDS SUCCESSFUL EXECUTION OF BUILDING PROJECTS IN NIGERIA EVALUATION OF QUARTZ DEPOSIT IN ANGWAN DOKA, KOKONA NASARAWA STATE-NIGERIA FOR PRODUCTION OF DENSE REFRACTORY BRICKS ASSESSMENT OF HUMAN RESOURCE MANAGEMENT PRACTICES OF BUILDING CONSTRUCTION FIRMS

click on whatsapp