Site Logo E-PROJECTTOPICS

ESTIMATES AS A TOOL FOR BUILDING PROJECT COST CONTROL


📝


Presented To


Environmental Design Department

📄 Pages: 86       🧠 Words: 6482       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 528      

⬇️ Download (Complete Report) Now!

ABSTRACT
Estimates as a Tool for Building Project Cost Control is a phenomena by those who have been monitoring the cost of building construction. The building industry is characterised as highly competative, very risky and with low profit margin. The cost of construction in the past years has also been on steady increase with varied reasons which includes political influence, poor tendering procedures and inflation. But for a construction firm to maintain a competative edge in the market and also ensure Good Profit Margin and the client to have Value for the money expended for a construction project, the method by which they Design, Estimate, Plan and Control this project must be ACCURATE and EFFICIENT. The lack or inadequacy of the said method can be said to constitute some of the main perennial problems and reasons for the high cost of building construction. It is in the light of the above that the theme of the study was chosen in order to investigate on a building cost control system for minimising the cost of building construction during the project execution phase with much emphasis on the estimating process of the said cost control system. To achieve the above topic of discussion the study was divided into six chapters. These chapters dealt vividly on an introduction to the objective and structure of the thesis, concepts of a building cost control system, cost estimates and estimating procedures, contractor's cost elements, three site investigations, conclusion and recommendation. It is hoped that the study will be useful for a building cost control by contractors and client and for future researches on areas that were not extensively discussed.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 86       🧠 Words: 6482       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 528      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

RELIABILITY OF THE ENGINEERS ESTIMATE IN SELECTIVE TENDERING FOR BUILDING WORKS AN EXPLORATION OF VWANA COSTUMES FOR SCULPTURAL DECORATIVE COLUMNS EVALUATION OF PROJECT RISK AND THE DETERMINATION OF CONTINGENCY SUM FOR BUILDING DEVELOPMENTS IN NIGERIA MODELLING THE INTER-RELATIONSHIPS AMONGST ELEMENTS OF SUSTAINABILITY STRATEGIES FOR SUSTAINABLE MANAGEMENT OF CONSTRUCTION PROJECTS APPLICATION OF PASSIVE COOLING TECHNIQUES IN THE DESIGN OF PROPOSED UNIVERSITY SENATE BUILDING AN APPRAISAL OF PREQUALIFICATION CRITERIA USED FOR CONTRACTORS SELECTION IN PUBLIC BUILDING PROJECTS IN NIGERIA IN-HOUSE PROFESSIONALS IN PROJECT DEVELOPMENT AND IMPLEMENTATION PATTERN AND URBAN MANAGEMENT CHALLENGES OF DEVELOPMENT CONTROL VIOLATIONS DEVELOPMENT OF A WHOLE-LIFE COST IMPLEMENTATION FRAMEWORK FOR THE NIGERIAN CONSTRUCTION INDUSTRY AN ASSESSMENT OF THE IMPLEMENTATION OF UNIVERSAL DESIGN PRINCIPLES IN THE PROVISION OF BUILDING SERVICES IN MULTI-STOREY BUILDINGS EVALUATING THE EFFECTS OF BUILDING FORMS ON THERMAL COMFORT IN OFFICE BUILDINGS IN HOT HUMID AREAS AN EVALUATION OF THE ENVIRONMENTAL FACTORS THAT LEAD TO ABANDONMENT OF PUBLIC BUILDING PROJECTS AN EVALUATION OF DISASTER PREPAREDNESS IN INDUSTRIAL BUILDINGS LOCAL GOVERNMENT SECRETARIAT, SAMINAKA (EXPRESSION OF CULTURE ON THE ARCHITECTURE OF PUBLIC BUILDINGS IN KADUNA STATE) EVALUATION OF THE RELATIONSHIP BETWEEN DELAYED PAYMENTS AND COST AND TIME OVERRUNS REDEVELOPMENT OF SOKOTO AIRPORT TERMINAL BUILDING MODELLING OF COST OVERRUNS IN BUILDING PROJECTS IN ABUJA BUILDING FAILURES EVALUATION OF COST RECOVERY FOR WATER SUPPLY IN MAKURDI AN EXPRESSION OF IMAGERY IN COURT BUILDINGS

click on whatsapp