Site Logo E-PROJECTTOPICS

RELIABILITY OF THE ENGINEERS ESTIMATE IN SELECTIVE TENDERING FOR BUILDING WORKS


📝


Presented To


Environmental Design Department

📄 Pages: 81       🧠 Words: 9274       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 204      

⬇️ Download (Complete Report) Now!

ABSTRACT
This research work deals with the investigation of the reliability or otherwise of the engineer's estimate in selective tendering for building works. The term 'engineer's estimate' as used in this work means the estimated cost of a building normally prepared for the client by his construction cost consultants just before or during tender period,based on the same tender documents given to selected tenderers. In this work, the bills of quantities forms part of the tender documentation. This estimate is also referred to as comparative or pre-tender or QS estimate. The investigation is limited to pre-contract stages of the building process. As a result of this, the investigation dealt mainly with the question of how reliable the engineers estimate is to the client, in terms of getting responsible tenders and awarding the contract within not more than +10 percent difference from the engineers estimated cost. It has been discovered during the investigation that clients rely heavily on the engineers estimate to the extent that for a contractor to win a contract for building works, his tender should not differ by more than +10 percent of the engineers or QS estimate. In addition to this, it has also been discovered that strict reliance on the engineers estimate, especially in cases where the trend of tenders reveal otherwise, might result in unpleasant post contract problems such as escalation of costs and possible delay or abandonment of the project. This is because the engineers estimate is not 100 percent reliable. As such, in cases where majority of tenders received differ very significantly from the engineers estimate, then the accuracy or otherwise of the engineers estimate should be looked into. Recommendations on how to improve the reliability of the engineers estimate are proposed in the conclusions. In general, this work has helped to bring out some problems in tendering as well as preparation of tender documents and pricing. It is hoped that the result of this research will be of immense benefit to the Government, various members of the Construction Industry and the general public.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 81       🧠 Words: 9274       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 204      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

INFLUENCE OF CLIENT ORGANISATION ON ACHIEVING VALUE IN BUILDING DESIGNS PERFORMANCE EVALUATION OF PRIMARY HEALTH CARE (PHC) BUILDINGS IN THE FEDERAL CAPITAL TERRITORY (FCT) LOCAL GOVERNMENT SECRETARIAT, SAMINAKA (EXPRESSION OF CULTURE ON THE ARCHITECTURE OF PUBLIC BUILDINGS IN KADUNA STATE) TOWARDS EVOLVING SUITABLE MODULAR SIZES FOR EFFECTIVE FLEXIBILITY IN ACADEMIC LIBRARY BUILDINGS: A PROPOSAL FOR FEDERAL UNIVERSITY OF TECHNOLOGY MINNA, LIBRARY COMPLEX KNOWLEDGE MANAGEMENT PRACTICE OF BUILDING CONSTRUCTION FIRMS AT PROJECT LEVEL UNRRODUCTIVE COSTS IN BUILDING PROJECTS AN ASSESSMENT OF LIFT SYSTEM PERFORMANCE IN SELECTED HIGH RISE BUILDINGS IN ABUJA CITY MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA ARCHITECTURAL RESPONSE TO EFFECTS OF WIND ON HIGH RISE BUILDING FORMS IN THE DESIGN OF MIXED-USE AT EKO ATLANTIC CITY LAGOS AN ASSESSMENT OF THE VARIABILITY OF COST AND TIME RELATED ITEMS OF PRELIMINARIES IN BUILDING CONTRACTS IN NIGERIA A STUDY OF TEACHERS' ASSESSMENT OF CHILDREN'S CREATIVE ART WORKS IN SOME PRIMARY SCHOOLS AN EVALUATION OF DISASTER PREPAREDNESS IN INDUSTRIAL BUILDINGS EVALUATING THE EFFECTS OF BUILDING FORMS ON THERMAL COMFORT IN OFFICE BUILDINGS IN HOT HUMID AREAS PROPOSAL FOR PRIVATE AIRLINES TERMINAL BUILDING MURTALA MOHAMMED AIRPORT LAGOS APPLICATION OF PASSIVE COOLING TECHNIQUES IN THE DESIGN OF PROPOSED UNIVERSITY SENATE BUILDING An Investigation into the conditions of contract with regards to claims in some selected building projects AN EVALUATION OF THE ENVIRONMENTAL FACTORS THAT LEAD TO ABANDONMENT OF PUBLIC BUILDING PROJECTS USE OF BUILDING FORMS AS ACOUSTICAL TREATMENT IN THE DESIGN OF AN IDOMA CULTURAL CENTRE BUILDING MAINTENANCE POLICY FORMULATION: A Market Oriented Approach EVALUATION OF PROJECT RISK AND THE DETERMINATION OF CONTINGENCY SUM FOR BUILDING DEVELOPMENTS IN NIGERIA

click on whatsapp