Site Logo E-PROJECTTOPICS

EVALUATION OF PROJECT RISK AND THE DETERMINATION OF CONTINGENCY SUM FOR BUILDING DEVELOPMENTS IN NIGERIA


📝


Presented To


Environmental Design Department

📄 Pages: 82       🧠 Words: 6677       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 266      

⬇️ Download (Complete Report) Now!

ABSTRACT
The construction industry is characterised with inherent risk and uncertainties as a result of its fragmented and competitive nature. This therefore makes it difficult to accurately estimate the cost of construction project. To achieve the objective of having work completed most especially within cost and quality, contingency sum is apportioned to cater for unforeseen items of work that may likely evolve. Therefore, this current study aims at evaluating project risks with a view to determining adequate contingency funds to improve project performance. A quantitative approach was used in obtaining data through structured questionnaires administered to the construction professionals practicing in the F.C.T. Abuja as well as survey pro forma to gather archival data on completed building projects. 402 questionnaires were returned (44.4% response rate) and found useful for further analysis and 47 projects were also considered suitable for the study. The data were analysed using Relative important index (RII), Severity Index (SI), correlation and regression analysis. The study revealed that deterministic method (percentage addition to base estimates) was the most commonly used method, contingency sum usually allocated to construction projects are inadequate and that other risk factors are not being considered in its allocation. The study concludes that contingency sum determination was insignificantly related to the perceived level of inherent risk (R2= 7%) in construction project; and also has a weak relationship with the cost overrun. Based on this, more scientific approach to estimating contingency sum should be employed instead of the experiential approach that often results into under or over estimation of construction cost and estimating professionals should pay greater attention to the effects of economic and environmental risk factors in allocating contingency sum

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 82       🧠 Words: 6677       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 266      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

SITE COST CONTROL MODEL FOR MEDIUM SIZED BUILDING PROJECT EVALUATION OF THE PROPERTIES OF METAKAOLIN BASED GEOPOLYMER CONCRETE MADE WITH RECYCLED CONCRETE AGGREGATE COMPARATIVE EVALUATION OF AHMADU BELLO UNIVERSITY WASTE STABILIZATION POND AND A CONSTRUCTED WETLAND 3-D READJUSTMENT OF PARTS OF THE NIGERIAN PRIMARY TRIANGULATION NETWORK WITH GNSS DATA AN ASSESSMENT OF CONTRACTOR’S RISKS EXPOSURE WITHIN SOME STANDARD FORMS OF BUILDING CONTRACT IN NIGERIA EVALUATION OF ARCHITECTURE AS A TOOL TO ENHANCE CREATIVITY IN THE DESIGN OF A CENTRE FOR ARTS AND CREATIVITY AN EVALUATION OF ART EDUCATION PROGRAMMES IN SOME SELECTED POST-PRIMARY SCHOOLS AN EVALUATION OF THE QUALITATIVE CHARACTERISTICS OF PATTERN DYED FABRICS OF SMALL SCALE DYEING INDUSTRIES IN SOME PARTS OF NIGERIA MODELING DURATION OF BUILDING RENOVATION PROJECTS AN APPRAISAL OF THE CAREER EXPERIENCES OF PROFESSIONAL WOMEN IN THE NIGERIAN CONSTRUCTION INDUSTRY AN ASSESSMENT OF THE NIGERIAN CONSTRUCTION INDUSTRY’S READINESS TO ADOPT VALUE MANAGEMENT PROCESS IN EFFECTIVE PROJECT DELIVERY A SYSTEM APPROACH TO EFFECTIVE PROJECT MANAGEMENT CONTROL FRAMEWORK FOR DETERMINING PERFORMANCE OF CONSTRUCTION PROJECTS DEVELOPMENT OF A WHOLE-LIFE COST IMPLEMENTATION FRAMEWORK FOR THE NIGERIAN CONSTRUCTION INDUSTRY AN EVALUATION OF SOME SUSTAINABLE RURAL DEVELOPMENT COMPONENTS IN THE DESIGN OF THE HADEJA-NGURU WETLANDS CONSERVATION PROGRAMME PROTOTYPE DESIGN AND COSTRCTION OF A TWO-CHAMBER INTERMITTENT TANK FURNACE FOR SIMULTANEOUS DUAL STUDIO GLASS MELTING IN NIGERIA KNOWLEDGE MANAGEMENT PRACTICE OF BUILDING CONSTRUCTION FIRMS AT PROJECT LEVEL AN APPRAISAL OF COST-BASED INFORMATION MANAGEMENT METHODS AT THE DESIGN STAGE OF BUILDING PROJECTS IN NIGERIA EVALUATION OF PERFORMANCE OF SOLID WASTE MANAGEMENT SERVICE PROVIDERS AN EXPRESSION OF IMAGERY IN COURT BUILDINGS

click on whatsapp