Site Logo E-PROJECTTOPICS

EVALUATION OF THE RELATIONSHIP BETWEEN DELAYED PAYMENTS AND COST AND TIME OVERRUNS


📝


Presented To


Environmental Design Department

📄 Pages: 85       🧠 Words: 12416       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 220      

⬇️ Download (Complete Report) Now!

ABSTRACT
This study was undertaken to establish the relationship that exist between delayed payments and time and cost overruns. Data were collected from seven hundred and fifty (750) construction projects in Nigeria completed between 1989 and 2005. After a careful study of the data on the seven hundred and fifty (750) projects, data on one hundred and fifty one (151) completed building projects were accepted and analysed. The total delay in payments, the time overrun, and the cost overrun were determined for each of the projects. The coefficients of correlation of delayed payments and cost overruns, and delayed payments and time overruns were calculated for combined public and private building projects, public building projects, and private building projects. For the combined public and private building projects, the value of the coefficients of correlation of delayed payments and cost overruns and delayed payments and time overruns are 0.41, and 0.5,3 respectively. For public building projects, the coefficients of correlation of delayed payments and cost overruns and delayed payments and time overruns are 0.41, and 0.57, respectively. In the case of private building projects, the coefficients of correlation of delayed payments and cost overruns and delayed payments and time overruns are 0.66, and 0.30, respectively. Two hypotheses, Hypothesis 1 and Hypothesis 2, were formulated to assess the significance of the correlation coefficients of delayed payments and cost overruns, and delayed payments and time overruns, respectively. Based on bivariate normal distribution of the data, the hypotheses were tested at 5% level of significance using the Fisher r-to-z transformation. The P-value for each of the correlation coefficients was found to be greater than the tabulated value. From the results, it is concluded that cost overrun has positive but weak relationship with delayed payments in the combined public and private building projects, and the public projects. Cost overrun has positive and fairly strong relationship with delayed payments in private building projects. Time overrun has positive but moderate relationship with delayed payments in combined public and private building projects. Time overrun has positive but weak relationship with delayed payments in private building projects. The coefficients of correlation of cost overruns and delayed payments, and time overruns and delayed payments for all categories of building projects studied are significant at 5% level of significance. From the values of correlation coefficients and the established significance of the correlation coefficients, delayed payments do cause time and cost overruns in building projects. From the findings of this study, it is recommended that delayed payments should be avoided to forestall the possibility of running into time and cost overruns and their associated consequences in building projects.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 85       🧠 Words: 12416       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 220      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

EVALUATION OF FACILITIES AND MATERIALS FOR TEACHING CERAMICS IN SOME SELECTED COLLEGES OF EDUCATION EVALUATION OF COST RECOVERY FOR WATER SUPPLY IN MAKURDI EVALUATION OF THE EFFECTIVENESS OF HEALTH AND SAFETY TRAINING PRACTICES OF CONSTRUCTION FIRMS EVALUATION OF UNDERGRADUATE SCULPTURE CURRICULUM IN SELECTED NIGERIAN UNIVERSITIES AN EVALUATION OF HOME AND SCHOOL ENVIRONMENTS ON THE ARTISTIC CREATIVITY OF PRIMARY SCHOOL CHILDREN AN EVALUATION OF THE CHARACTERISTICS OF STABILIZED POURED LATERITE BEAMS REINFORCED WITH POLYPROPYLENE ROPE AN EVALUATION OF CONTRIBUTION OF COST CONTINGENCY TOWARDS SUCCESSFUL EXECUTION OF BUILDING PROJECTS IN NIGERIA AN ASSESSMENT OF THE VARIABILITY OF COST AND TIME RELATED ITEMS OF PRELIMINARIES IN BUILDING CONTRACTS IN NIGERIA DEVELOPING A PROACTIVE COST MANAGEMENT MODEL FOR BUILDING PROJECTS IN NIGERIA AN EXPLORATION OF SHURUWA MUSICAL INSTRUMENT AND DANCE COSTUME IN PAINTING MODELLING THE INTER-RELATIONSHIPS AMONGST ELEMENTS OF SUSTAINABILITY STRATEGIES FOR SUSTAINABLE MANAGEMENT OF CONSTRUCTION PROJECTS AN EVALUATION OF URBAN DEGENERATION IN ABA CORE AREA AND A PHYSICAL PLANNING PROPOSAL FOR A SELECTED AREA AN EVALUATION OF ENERGY CONSUMPTION AND CONSERVATION OPPORTUNITIES FOR BUILDINGS AT NATIONAL RESEARCH INSTITUTE FOR CHEMICAL TECHNOLOGY ZARIA CONTROL OF LABOUR COSTS IN BUILDINGS A DIALOGUE BETWEEN LINES AND FLORAL MOTIFS IN PAINTING EVALUATION OF PERFORMANCE OF SOLID WASTE MANAGEMENT SERVICE PROVIDERS AN EXPLORATION OF VWANA COSTUMES FOR SCULPTURAL DECORATIVE COLUMNS A STUDY OF MWAGHAVUL FESTIVAL COSTUMES IN PLATEAU STATE AN EVALUATION OF DECORATED TRADITIONAL CLOTH USED IN TIV CULTURAL ACTIVITIES DEVELOPMENT OF A WHOLE-LIFE COST IMPLEMENTATION FRAMEWORK FOR THE NIGERIAN CONSTRUCTION INDUSTRY

click on whatsapp