AN APPRAISAL OF FACTORS MILITATING AGAINST THE EFFECTIVE IMPLEMENTATION OF FORMAL RISK MANAGEMENT TECHNIQUES IN PROJECT DELIVERY

(A CASE STUDY OF ABUJA, NIGERIA)


📝


Presented To


Environmental Design Department

📄 Pages: 83       🧠 Words: 8752       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 226      

⬇️ Download (Complete Report) Now!

ABSTRACT
Non utilization of Formal Risk Management Techniques in project delivery by the project team has been identified as one the causes of project failure This prompts the question 'what factors are responsible?' This study therefore first presents Risk management in project delivery as it relates to an integrated project team as well as internal issues. It then focuses on formal Risk management techniques and their processes of implementation with a view to revealing the internal and external barriers that inhibit their utilization in project delivery in Abuja Metropolis, Nigeria. A total of 391 questionnaires were distributed to construction firms and stakeholders in ABUJA metropolis but a total of 203 firms responded. Data retrieved were analyzed using descriptive statistics, ANOVA and spearman correlation coefficients. The internal barriers were found to be cost and time intensiveness, argumentative sessions that create riskier stance including subjective judgment that lacks accurate results while the external barriers were found to be lack of risk assessment training in place, lack of collaboration by parties on a project, low level of risk consciousness, ineffective monitoring by heads of firms and lack of historical data across the project team's spectrum. The study recommends strategies such as improving the grey areas in the implementation processes through research for internal barriers and conducting sensitization, legislation, business regulations and mandatory training to overcome the external barriers.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 83       🧠 Words: 8752       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 226      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

SUSTAINABLE WASTE MANAGEMENT SYSTEM IN ABATTOIR DESIGN AN ASSESSMENT OF SHARED LEADERSHIP AND TEAM PERFORMANCE IN CONSTRUCTION PROJECTS ADOPTABILITY OF INTEGRATED PROJECT DELIVERY (IPD) CONCEPTS IN THE NIGERIAN CONSTRUCTION INDUSTRY TOWARDS EFFECTIVE PLANNING FOR SANITATION IN EDIBLE OIL INDUSTRIES IN-HOUSE PROFESSIONALS IN PROJECT DEVELOPMENT AND IMPLEMENTATION DISSOLVED SEDIMENT DELIVERY BY THE SAMARU STREAM INTO THE AHMADU BELLO UNIVERSITY RESERVIOR APPRAISAL OF THE SUPPORT ZONE COMMUNITY PROGRAMME ANALYSIS OF WOMEN'S PARTICIPATION AND INCORPORATION IN WASTE PICKING AND SOLID WASTE MANAGEMENT IN SOKOTO METROPOLIS AN ANALYSIS AND APPRAISAL OF PROFESSOR ABBAS AHUWAN’S CERAMIC FORMS A SURVEY OF FACTORS AFFECTING THE PERFORMANCE OF SECONDARY SCHOOL STUDENTS IN DRAWING IN THREE SELECTED SCHOOLS IN ZARIA ADAPTATION OF TRADITIONAL DESIGNS ON CRAFTS OF SOUTHERN KADUNA AS MOTIFS FOR TEXTILES RESIST TECHNIQUES APPRAISAL OF THE IMPLEMENTATION OF TINAPA TOURIST RESORT PROJECT URBAN MANAGEMENT IMPLICATIONS OF PERI URBAN GROWTH AN APPRAISAL OF THE DEVELOPMENT AND MANAGEMENT OF ORGANISED OPEN SPACES IN KADUNA METROPOLIS APPRAISAL OF THE URBAN MANAGEMENT CHALLENGE OF INFORMAL LAND DELIVERY ANALYSIS OF DOMESTIC SOLID WASTE MANAGEMENT STRATEGIES ASSESSMENT OF THE IMPLEMENTATION OF THE CENTRAL AREA DEVELOPMENT PLAN OF THE FEDERAL CAPITAL CITY, ABUJA ASSESSMENT OF THE COMMERCIALIZATION PROGRAMME OF SOLID WASTE MANAGEMENT A SYSTEM APPROACH TO EFFECTIVE PROJECT MANAGEMENT CONTROL ASSESSING THE EFFECTIVENESS OF PUBLIC PRIVATE PARTNERSHIP (PPP) PROCUREMENT MODEL FOR INFRASTRUCTURE DEVELOPMENT IN NIGERIA

click on whatsapp