Site Logo E-PROJECTTOPICS

AN ASSESSMENT OF CONTRACTOR’S RISKS EXPOSURE WITHIN SOME STANDARD FORMS OF BUILDING CONTRACT IN NIGERIA


📝


Presented To


Environmental Design Department

📄 Pages: 99       🧠 Words: 10992       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 199      

⬇️ Download (Complete Report) Now!

ABSTRACT
Construction projects are subjected to several risks due to different activities involved. The activities are performed by several parties under different circumstances. Among the various stakeholders the Contractor has been identified to be the party that carries the highest number of risks. They are mostly exposed to contractual risks which occur as a function of contract provisions and clauses. This research work identified and assessed the risks which Contractors are exposed to within some Standard Forms of Contract in Nigeria. It further determined the likelihood of occurrence of the identified risks, impact on the risks on Contractors and the level of risks. Data were collected through questionnaires distributed to some Contractors around Abuja and analysed using qualitative risk analysis technique. The research identified 35 potential risk factors with 54% of the risks emanating from the Clients, 31% from the Architect, 6% from the Quantity Surveyor, 6% from the Project Managers and 3% from the government agents. It also found out that failures to write instructions regarding variations and documents which are not issued on time are the major potential risk factors with high likelihood of occurrence while the other risk factors have moderate likelihood of occurrence. Thirteen (13) potential risk factors were found to have high impact on Contractors and fifteen (15) are high degree of risk. It concluded that Contractors must understand the nature of risks, their source and the extent of exposure so as to pay attention to dealing with such risks in present and future projects. The study therefore recommended that Contractor should pay attention to risks with high likelihood of occurrence so as to reduce their impact, should protect themselves against risks by contingency, warn parties of potential delays and its implications, negotiate construction schedule with client and allow for buffer time, the contractor should ensure working with carefully prepared and coordinated drawings, establish clear line of communications for receiving and responding to instructions and collaborative effort from all the participants of the project.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 99       🧠 Words: 10992       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 199      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

ESTIMATES AS A TOOL FOR BUILDING PROJECT COST CONTROL THE CONTRIBUTIONS OF NIGERIAN ARTISTS AND ART EDUCATORS TO THE DEVELOPMENT OF ART EDUCATION IN NIGERIA AN ASSESSMENT OF THE INFLUENCE OF COMBUSTION GENERATED POLLUTANTS ON THE INDOOR AIR QUALITY OF SELECTED LABORATORIES ASSESSING THE CAPABILITIES OF CONTRACTORS IN MONITORING AND CONTROLLING CONSTRUCTION CASH FLOW IN NIGERIA THE SIGNIFICANCE, MEANINGS AND AESTHETIC VALUES OF SOME NIGERIAN ARMY BADGES ARCHITECTURAL RESPONSE TO EFFECTS OF WIND ON HIGH RISE BUILDING FORMS IN THE DESIGN OF MIXED-USE AT EKO ATLANTIC CITY LAGOS MAPPING AND ANALYSIS OF SITES FOR GRAZING RESERVES IN SOME STATES OF NORTHERN NIGERIA EVALUATION OF UNDERGRADUATE SCULPTURE CURRICULUM IN SELECTED NIGERIAN UNIVERSITIES SURVEY OF ONDO TRADITIONAL HAND WOVEN FABRICS AND THEIR MODIFICATIONS TO SUIT CONTEMPORARY FASHION TRENDS IN NIGERIA APPLICATION OF BIOCLIMATIC PRINCIPLES TO REDUCE ENERGY CONSUMPTION IN THE DESIGN OF SENATE BUILDING FOR NASARAWA STATE UNIVERSITY BUILDING FAILURES BALANCE AND STABILITY IN THE EXPLORATION OF EQUESTRIAN FORMS WITH CHARCOAL IN SCULPTURE AN EVALUATION OF THE QUALITATIVE CHARACTERISTICS OF PATTERN DYED FABRICS OF SMALL SCALE DYEING INDUSTRIES IN SOME PARTS OF NIGERIA CONTEXTUALISATION OF POTHOLES ON NIGERIAN ROADS IN PAINTING AN ASSESSMENT OF SAFETY RISK FACTORS DURING INSTALLATION AND DISMANTLING OF TOWER CRANES ON CONSTRUCTION SITES ASSESSMENT OF HOUSING AFFORDABILITY IN ZARIA URBAN AREA ASSESSMENT OF THE IMPLEMENTATION OF ABUJA TOURISM DEVELOPMENT MASTER PLAN (2000 – 2010) A METAPHORIC TRANSFORMATION OF THE PAWPAW TREE INTO FEMALE FORMS IN PAINTING AN APPRAISAL OF ATYAP PERFORMING ARTS OF ZANGON KATAF KADUNA STATE, NIGERIA (1950 – 2013) AN EVALUATION OF THE EFFECTIVENESS OF THE USE OF COLOUR IN CONTEMPORARY NIGERIAN MAGAZINE ADVERTISEMENT DESIGN

click on whatsapp