Site Logo E-PROJECTTOPICS

DEVELOPMENT OF A MODIFIED REAL-TIME FAULT-TOLERANT TASK ALLOCATION SCHEME FOR WIRELESS SENSOR NETWORKS


📝


Presented To


Engineering Department

📄 Pages: 84       🧠 Words: 10841       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 525      

⬇️ Download (Complete Report) Now!

ABSTRACT
This research aimed at the development of a modified real-time fault-tolerant task allocation scheme (mRFTAS) for wireless sensor networks (WSNs), using active replication backup techniques. In WSNs, the sensor nodes are at risk of failure and malicious attacks (selective forwarding) and this can have a profoundly negative effect on real-time WSNs. The real-time fault-tolerant task allocation scheme (RFTAS) was developed to address these issues, however, it has the problem of processing time delay. This is attributed to the characteristic of the passive backup copy technique adopted for the RFTAS in which the backup copy is only activated when the primary copy has failed. The delay in the activation of the backup copies of the primary tasks in tasks allocation execution processes as a result of a failure of sensor nodes or the primary tasks, will cause disastrous consequences if the systems are safety-critical, e.g. aircraft, nuclear power plant, forest fire detection, battlefield monitoring. The mRFTAS was therefore developed using the active replication backup technique where both the primary and backup copies of tasks are executed concurrently. The performance of the mRFTAS and RFTAS was compared using total execution time of the task, energy consumption, reliability cost and network lifetime. A graphical user interface (GUI) based system for simulation of sensor nodes in WSNs using RFTAS and mRFTAS called the task allocation scheme simulator (TASS) was developed in order to carry out the performance evaluation. The performance of mRFTAS showed an improvement over RFTAS in terms of minimizing task execution time (28.65%) and reliability cost (7.29%) while maximizing network lifetime (22.26%) but with a trade-off in energy consumption (-17.32%).

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 84       🧠 Words: 10841       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 525      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

THE EFFECT OF ELAPSED TIME AFTER MIXING ON THE PROPERTIES OF MODIFIED LATERITE DEVELOPMENT OF A MULTIVARIATE HIGH- ORDER FUZZY TIME SERIES FORECASTING MODEL WITH DATA CLUSTERING FOR OPTIMUM PREDICTION AND CONTROL OF HANDOVER-BASED MOBILITY MANAGEMENT DEVELOPMENT AND CHARACTERIZATION OF POLY(LACTIC ACID)(PLA)/ GUINEACORN (SORGHUM BICOLOR) HUSKS PARTICULATE (GHP) COMPOSITES DEVELOPMENT AND PERFORMANCE OPTIMISATION OF A TWO-ROW ENGINE-PROPELLED SEEDRIDGE PLANTER DEVELOPMENT AND OPTIMIZATION OF THE THRESHING PERFORMANCE OF A MULTICROP THRESHER DEVELOPMENT AND CHARACTERIZATION OF GLASS CERAMIC FROM COCA-COLA GLASS BOTTLE AND MAGNESITE A STUDY OF CRUMB RUBBER MODIFIED ASPHALT SLURRY SEAL EMULSIONS DEVELOPMENT AND SIMULATION OF A SINUSOIDAL PULSE WIDTH MODULATION-BASED CONTROL SCHEME FOR IMPROVED EFFICIENCY AND TORQUE PRODUCTION IN SINGLE PHASE INDUCTION MACHINES MODELING AND STABILIZATION ANALYSES OF A MICROUNMANNED AERIAL VEHICLE SYSTEM USING A MODIFIED RADIO CONTROLLED-BASED HELICOPTER DEPURATION STUDIES ON KADUNA REFINERY WASTEWATER USING MODIFIED Cu-DOPED GOETHITE CATALYST DEVELOPMENT OF A FUZZY TIME SERIES MODEL USING CAT SWARM OPTIMIZATION CLUSTERING AND OPTIMIZED WEIGHTS OF FUZZY RELATIONS TIME AND COST PERFORMANCE LIABILITY ALLOCATION IN THE BUILDING PROCESS DEVELOPMENT OF A PILOT ALLOCATION PROTOCOL TO MITIGATE THE EFFECT OF PILOT CONTAMINATION IN MASSIVE MULTIPLE INPUT MULTIPLE OUTPUT SYSTEM DEVELOPMENT OF PREDICTIVE MODEL FOR INTRA-CITY BUS TRAVEL TIME DEVELOPMENT OF AN IMPROVED SCHEDULING ALGORITHM FOR MULTICAST SERVICES OVER WiMAX NETWORKS USING PARTICLE SWARM OPTIMIZATION TECHNIQUES DEVELOPMENT OF A CULTURAL ALGORITHM BASED-ARTIFICIAL BEE COLONY FOR IMPROVED PROPORTIONAL-INTEGRAL-DERIVATIVE CONTROLLER PARAMETER TUNING DEVELOPMENT OF FIREFLY ALGORITHM BASED METHOD FOR DISTRIBUTED GENERATION PLANNING IN AN UNBALANCED THREE-PHASE DISTRIBUTION NETWORK USING VOLTAGE STABILITY INDEX DEVELOPMENT OF CATALYST SUPPORT MATERIAL FROM PINDIGA BENTONITIC CLAY DEVELOPMENT OF AN IMPROVED MULTI-HOP ROUTING PROTOCOL IN WIRELESS SENSOR NETWORKS BASED ON CLUSTER HEAD LOAD BALANCING TECHNIQUE A CUCKOO SEARCH BASED CO-ORDINATION OF DISTRIBUTED GENERATION UNITS AND SHUNT CAPACITOR BANK IN RADIAL DISTRIBUTION NETWORKS

click on whatsapp