Site Logo E-PROJECTTOPICS

EMPIRICAL DETERMINATION OF LABOUR OUTPUT FOR FLOOR SCREED AND TILE FINISHES FOR CONSTRUCTION WORK IN ABUJA


📝


Presented To


Environmental Design Department

📄 Pages: 89       🧠 Words: 9257       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 223      

⬇️ Download (Complete Report) Now!

ABSTRACT
There is dearth of information on output level of building operatives in Nigeria, consequently, the output constants currently used for preparation of construction estimates are remnants of British colonial heritage or derived from untested experiences. Therefore this study aims at empirically determining output constants for floor finishes (screeds and tiles) for building project in Abuja. The objectives are to identify the productivity factors related to Building Engineering Standard Method of Measurement 3 (BESMM3) and evaluation of their impact on the outputs of five work items of floor finishes. The procedure adopted field survey involving work measurement to observe and measure operatives output. Data was collected from 80 on-going construction sites with an average of 50 gangs of workers for each work item to establish the following average outputs per day; 25mm thick cement and sand screed (23.70), 44mm thick cement and sand screed (19.31), 400 X 400mm ceramic floor tile (27.38), 300 X 600mm ceramic floor tile (30.18) and 300 X 300mm ceramic floor tile (23.61). The study also revealed a significant difference on mode of employment and period of observation on the outputs of the workers. The results suggest that experience and negotiation as mode of employment affect output of workers to varying degrees based on the thickness of floor screed and unit area of floor tile. The study has recommended that the established output should serve as an effective baseline for efficient estimating process and be in compliance with the BESMM requirements.

PLEASE NOTE

This material is a comprehensive and well-written project, structured into Chapter (1 to 5) for clarity and depth.


To access the full material click the download button below


OR


Contact our support team via Call/WhatsApp: 09019904113 for further inquiries.

Thank you for choosing us!

📄 Pages: 89       🧠 Words: 9257       📚 Chapters: 5 🗂️️ For: PROJECT

👁️‍🗨️️️ Views: 223      

⬇️ Download (Complete Report) Now!

🔗 Related Topics

MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA AN APPRAISAL OF SOFT SKILLS REQUIRED FOR SUCCESSFUL PROJECT MANAGEMENT OF CONSTRUCTION PROJECTS THE IMPLEMENTATION OF THE MASTER PLAN FOR THE FEDERAL CAPITAL CITY, ABUJA: A Review of the problems of Development Control AN APPRAISAL OF THE PERFORMANCE OF STAKEHOLDERS MANAGEMENT IN CONSTRUCTION PROJECTS DEVELOPING FACTOR-BASED MODELS FOR MEASURING AND PREDICTING HAZARD RECOGNITION CAPABILITY OF CONSTRUCTIONWORKERS ASSESSMENT OF BARRIERS TO COMMUNICATION IN THE NIGERIAN CONSTRUCTION INDUSTRY AN ASSESSMENT OF SHARED LEADERSHIP AND TEAM PERFORMANCE IN CONSTRUCTION PROJECTS ADOPTABILITY OF INTEGRATED PROJECT DELIVERY (IPD) CONCEPTS IN THE NIGERIAN CONSTRUCTION INDUSTRY AN ASSESSMENT OF THE PARTICIPATORY ATTRIBUTES OF CONSTRUCTION PROFESSIONALS FOR EFFECTIVE VALUE MANAGEMENT 3-D READJUSTMENT OF PARTS OF THE NIGERIAN PRIMARY TRIANGULATION NETWORK WITH GNSS DATA A CONTEXTUAL ANALYSIS OF SELECTED ART WORKS ON PEACE AND CONFLICT RESOLUTION NIGERIAN ASSOCIATION OF CHAMBERS OF COMMERCE, INDUSTRY, MINES AND AGRICULTURE HEADQUARTERS, ABUJA ASSESSMENT OF PROFESSIONAL'S PERCEPTION OF KNOWLEDGE AND SKILLS REQUIREMENT OF CONTRACTORS FOR MASS HOUSING CONSTRUCTION VOCATIONAL CENTRE FOR MUSLIM WOMEN ABUJA (Creating the appropriate environment for the Ideal Muslim Woman) CREDIT FACILITIES IN THE FINANCIAL INSTITUTIONS FOR FINANCING CONSTRUCTION PROJECTS IN NIGERIA GEOSPATIAL ANALYSIS OF QUARRY ACTIVITIES IN MPAPE DISTRICT, ABUJA NIGERIA APPRAISAL OF ABUJA METROPOLITANT MANAGEMENT COUNCIL (AMMC) STRUCTURE AND PROCESS ARCHITECTURAL RESPONSE TO EMERGENCY CARE IN THE DESIGN OF ABUJA GENERAL HOSPITAL BUILD-OPERATE TRANSFER (BOT) FACTORING METHOD:A FINANCING SCHEME FOR CONSTRUCTION PROJECT PLANNING AND CONTROL MODEL FOR THE CONSTRUCTION OF A LARGE IRRIGATION PROJECT

click on whatsapp